Monday, June 4, 2018

SEISMIC RESPONSE OF BUILDING BASE ISOLATED WITH FILLED RUBBER BEARINGS UNDER EARTHQUAKES OF  DIFFERENT CHARACTERISTICS

EDI MARDIONO
1404101010027

Student of Civil Engineering University of Syiah Kuala, Aceh, Indonesia.



Seismic base isolation is now an accepted practice, in many parts of the world, for protecting important buildings from earthquake forces. For low to moderate height buildings, natural rubber
bearing has often been considered suitable because of its durability and easier fabrication. Many recent studies showed that low stiffness of base isolation systems could cause unacceptably large displacements of ground floor of the building necessitating substantial amount of damping in the isolation system.

INTRODUCTION
The base isolation system consists in introducing low stiffness bearings and damper between foundation and superstructure. Bearings provide the needed flexibility to the combined system so as to shift its first mode natural frequency away from predominant frequency of the design earthquake motion. This results in the reduction of inertial forces and accelerations several times. The idea behind base isolation has been proposed again and again for at least a century. Earlier the elastomeric bearings were made up of natural rubber, which possess very low energy dissipating capacity resulting in unacceptably high displacements at isolation level. Recent advances in rubber technology have enabled the manufacturers of these bearings to have better control over the structural properties of the rubber. This is achieved by mixing suitable amount of certain chemicals in the natural rubber. These filled rubbers can be used efficiently in the manufacture of isolation bearings. The laminated rubber bearings made by these filled rubbers have high initial stiffness, which reduces, at high level of shear strains. Therefore, behavior of these bearings can be simulated by bilinear curve. The area of hysteretic loop i.e. damping for an earthquake event is controlled by yield force and post-to-pre yield stiffness ratio of the bearing which can be controlled by fillers. The purpose of this paper is to investigate the effectiveness of base isolation by filled rubber bearing and influence of bearing parameters viz. post-to-pre yield stiffness ratio and yield displacement on the isolation damping of a six storey reinforced concrete building excited undirectionally with ground motions having different characteristics.


FILLED RUBBER BEARINGS
The isolation system considered in this study is elastomeric bearing. The most common elastomers used in elastomeric bearings are natural rubber, neoprene rubber, butyl rubber and nitrile rubber. The mechanical properties of natural rubber are superior to those of most synthetic elastomers used for seismic isolation bearings. Therefore natural rubber is most frequently recommended material for use in elastomeric bearings followed by neoprene. Butyl rubbers are suitable for low temperature applications and nitrile rubber have limited application in offshore oil structure.


METHOD OF ANALYSIS OF BASE ISOLATED BUILDING
The time history analysis of the base isolated building is carried out using the computer program 3D-BASISTABS. A full three-dimensional representation of the structure is used in time history analysis of the base isolated buildings. The isolation system is


modelled as a bilinear hysteretic element. The details of method of analysis are described by Reinhorn et al. (1994). Following assumptions are made for the analysis of base isolated building:
·         The superstructure is elastic at all time and the non-linear behaviour is restricted in isolators only.
·         All frame substructures are connected at each floor level by a diaphragm, which is infinitely rigid in its own plane.
·         Each floor has three degrees of freedom (two translations and one rotation) attached to the centre of mass of each floor. The isolation devices are rigid in the vertical direction and each has negligible torsion resistance.
·         Effect of infilled walls on stiffness of the structure is negligible. These are considered in computation of mass only..



CONCLUSIONS
Filled rubber bearings are suitable for ground motions having high dominating frequencies but is not effective for ground motions whose dominant frequencies are close to natural frequency of base isolated structure. The fundamental period for a bearing is unique for given bearing parameters but the damping is found to be dependent upon the characteristics of input ground motion also. Yield displacement can be used as an important parameter for controlling damping in order to achieve desired base displacement.

from http://alasah.blogspot.com/

DAILY

        MY DAILY ACTIVYTY
  
          I stay with some friends in a boarding house. I usually wake up earlier than all friends. I wake up at 5 o’clock in the morning. I wash my face and do jogging on road near the house. Sometimes one of my friends does jogging with me. I like jogging because I can meet other friends. Besides, jogging makes my body healthy.
          After jogging, I buy food and drink for my breakfast. I usually buy one pack of yellow rice with vegetable and meat inside. In the boarding house, I eat yellow rice as my breakfast. After having breakfast, I clean my room and take a bath. 
          When I have morning class, I go to campus and study in the class. I often wait for a next class in the campus. I occasionally have my lunch at canteen in my campus.

          I join some student organizations in the campus. I spend my free time to do some activities related to organizations. We have monthly meetings to discuss some events. At home, I finish all tasks as soon as possible so I can sleep early. I usually go to sleep at 10 p.m. after brushing my teeth.

from https://englishcoo.com/contoh-daily-activity/

Contoh Surat Komplain Bahasa Inggris

SEKAR JAYA FORWARD CV
Soekarno-Hatta Highway No. 123
Sekaran Gunungpati, Semarang 50229 cp: 02408768656


No: 040/HRD/SMJ/X/2013 October 10, 2013
Lamp:-
Terms: Complaint

To,
Designation. The Father/Mother-Led
CV PEARL GROUP
Jalan Majapahit No. 231, Surabaya

With respect,
We as management CV SEKAR JAYA FORWARD to thank you for the cooperation that has beenundertaken. But for the sake of the common good with this letter we would like to pass on a few things with regard to raw materials that our message of your company.

Our raw materials are the message already arrived in October 8, 2013 however the condition of the raw materials in the form of polyester fibre does not correspond to what we want, with rician as follows:

The packaging is damaged so that the fibers are dirty.
Raw materials are sent does not correspond to what our message
The raw materials are experiencing delays.

We hope that these raw materials replaced immediately considering the production process will stop if the raw material does not exist. So our gratitute letter ni with intent so that in the future the same thing did not happen. Thank you for your attention and cooperation of father/mother-led company.
Sincerely,


SEKAR JAYA FORWARD CV

(Terjemahan)

CV SEKAR MAJU JAYA

Jalan Raya Soekarno-Hatta No. 123
Sekaran Gunungpati, Semarang 50229 cp: 024-08768656
e-mail: sekar.maju.jaya@gmail.com website:www.sekar.maju.jaya.co.id

No : 040/HRD/SMJ/X/2013 10 Oktober 2013
Lamp : –
Hal : Komplain
Kepada ,
Yth. Bapak/Ibu Pimpinan
CV MUTIARA GROUP
Jalan Majapahit No. 231, Surabaya
Dengan hormat,
Kami selaku manajemen CV SEKAR MAJU JAYA mengucapkan terima kasih atas kerjasama yang selama ini terjalin. Namun demi kepentingan bersama dengan surat ini kami ingin menyampaikan beberapa hal berkenaan dengan bahan baku yang kami pesan dari perusahaan anda.
Bahan baku yang kami pesan sudah tiba apda tanggal 8 oktober 2013 namun kondisi bahan baku berupa serat polyester tidak sesuai dengan yang kami inginkan, dengan rician sebagai berikut:
Kemasan mengalami kerusakan sehingga serat kotor.
Bahan baku yang dikirim tidak sesuai dengan apa yang kami pesan
Bahan baku mengalami keterlambatan.
Kami berharap bahwa bahan baku tersebut segera diganti mengingat proses produksi akan berhenti jika bahan baku tidak ada. Demikian surat ni kami sampaikan dengan maksud agar dikemudian hari tidak terjadi hal yang sama. Terima kasih atas perhatian dan kerjasama Bapak/Ibu pimpinan perusahaan.
Hormat Kami,


CV SEKAR MAJU JAYA

Procedure Text


How to Make a Glass of Coffee 
Cara Membuat Kopi dalam bahasa Inggris
Sumer gambar :  http://weknowyourdreams.com/images/coffee/coffee-06.jpg

Materials :
  • water
  • Sugar
  • Coffee
  • Glass,
  • Spoon
  • kettle
Steps :
  • boil the water First
  • Second, take two spoons of coffee and two spoons of sugar. put into a glass
  • Next, pour the hot water into a glass
  • Then, stir it gently
  • Finally, your coffee is ready to drink
Terjemahan atau arti Bahasa Indonesianya
Cara Membuat Kopi
Alat dan bahan
  • air
  • gula
  • kopi
  • Gelas
  • sendok
  • teko
Langkah-langkah :
  • rebus air dahulu
  • yang kedua, ambil dua sendok kopi dan dua sendok gelas. Masukkan ke dalam gelas
  • Selanjutnya, tuangkan air panas ke dalam gelas
  • Lalu, aduk secara perlahan 
  • akhirnya, kopimu siap untuk diminum